System House, Horndon Industrial Park, West Horndon CM13 3XL

|      01277 812888

Waterproofing

A Sustainable Community At The Heart Of NW7

WIDOPAN proudly supplies products and systems to all types of projects. Whether industrial, commercial or, in the case of this next project, residential.

A new development was planned for this leafy suburb of London, and once again, WIDOPAN was contacted to help.

Millbrook Park, Mill Hill, London

The vision for Millbrook Park was to create a thriving and sustainable community comprising a range of imaginative new homes.

Architects designed a range of houses and apartments to suit today’s lifestyles.

The project would include a range of community facilities, the new Millbrook Park Primary School and almost six hectares of open space.

The project was carried out by Taylor Wimpey Plc in 2017.

WIDOPAN waterproofing products were selected to provide waterproof sealing to the apartment building being built as part of this development.

The Heron Apartments, to the north of the site, had two large expanses of roof area that required waterproofing work.

The first was the main roof that doubles up as the 4th-floor terraces for the duplex apartments. The second was an elevated roof on the same structure.

WIDOPAN products and systems were the perfect solutions for meeting the waterproofing demands of this stylish structure.

WIDOPAN-FD Polyester Waterproofing System

The approved contractors selected to carry out the work at Millbrook Park were T&T Roofing Limited.

Being a newly built concrete structure and work planned to span some of the winter months, it was a potentially demanding situation.

 

  

Millbrook Park, Mill Hill, London

January, 2017.

Flat Roof, New Build

WIDOPAN-FD Polyester Waterproofing System

WIDOPAN-FD was the product selected and was the perfect material to be used in these restrictive conditions.

WIDOCRYL-Concrete Primer PM was specified, alongside WIDOPAN-FD resin and 165g Reinforcement Fleece to complete the protection.

WIDOCRYL- PM Concrete Primer can be applied to new and damp concrete substrates, making it perfect for this project.

Construction was moving at a fast pace during the wet winter months, and waiting for a completely dry substrate to waterproof wasn’t an option.

Installing the products at temperatures as low as -5˚c was a significant factor in keeping the project in line with the schedule.

The result was a stunning finish providing a secure and durable waterproof seal for the Heron Apartments.

This project was a great way to showcase the contemporary finish that WIDOPAN-FD provides to a project of this magnitude.

WIDOPAN provides products and systems suitable for industrial, commercial or residential projects of any size.

Contact us to discuss what we can do for your next development.

Widopan

Projects